<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Scottish power energy networks Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/scottish-power-energy-networks/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Tue, 01 Jun 2021 08:41:06 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>Scottish power energy networks Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Solar Park at Fields Farm</title>
		<link>https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Thu, 20 Apr 2017 10:46:15 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Scottish power energy networks]]></category>
		<category><![CDATA[Solar energy]]></category>
		<guid isPermaLink="false">http://www.energycreative.co.uk/gfconnect/?p=562</guid>

					<description><![CDATA[<p>The land area, located adjacent to an existing solar park, required a connection of 11kV to the local Scottish Power Energy Networks distribution network. <a href="https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/">Solar Park at Fields Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">The land area, located adjacent to an existing&nbsp;<a href="https://greenfrogconnect.co.uk/sectors/renewable-energy-grid-connection/" data-type="page" data-id="1040" target="_blank" rel="noreferrer noopener">solar park</a>, required a connection of 11kV to the local Scottish Power Energy Networks distribution network. To reduce the contestable costs the substation was located as close as possible to the point of connection. We designed and built a sequential breaker to allow this to be achieved.</p>



<div class="wp-block-image"><figure class="alignleft size-full is-resized"><img fetchpriority="high" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm.jpg" alt="Solar Park at Fields Farm" class="wp-image-2423" width="810" height="540" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm.jpg 1620w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-1536x1024.jpg 1536w" sizes="(max-width: 810px) 100vw, 810px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Shropshire<br>Capacity:&nbsp;3.5MW<br>Project length:&nbsp;Six months<br>Client:&nbsp;<a href="https://www.lightsourcebp.com/uk/" target="_blank" rel="noreferrer noopener">Lightsource Renewable Energy</a></h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Completed on time allowing the client to meet their feed-in tariff deadline.</li><li>Completed on budget despite challenging off-site cable route along A41 which went through a built-up area, and over a shallow canal bridge.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">The project comprised a 5MW (export) electricity connection to a new solar park. We acted as the Independent Connections Provider and undertook the following scope of services:</p>



<ul class="wp-block-list"><li>Construction of the electricity grid connection contestable works. Single 3.5MW teed connection to the SPEN distribution network, 1.2km of 11kV power cabling systems and optical fibre, new substation building with associated switchgear, auxiliary plant, and equipment.</li><li>Construction of the balance of plant sequential switchgear comprising the installation of 11kV switchgear, substation civil works, and 0.7km of 11kV power cabling systems.</li></ul>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/">Solar Park at Fields Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
