<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Solar energy Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/solar-energy/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Tue, 01 Jun 2021 08:41:06 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>Solar energy Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Private wire solar installation</title>
		<link>https://greenfrogconnect.co.uk/2021/06/01/private-wire-solar-installation-at-factory/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Tue, 01 Jun 2021 08:05:11 +0000</pubDate>
				<category><![CDATA[Industrial and commercial]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[Design and build]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Solar energy]]></category>
		<guid isPermaLink="false">https://greenfrogconnect.co.uk/?p=2416</guid>

					<description><![CDATA[<p>Green Frog Connect have connected a 4.9MW private wire solar installation at a factory in Leicestershire to the grid, creating a sustainable production facility which is the first of its’ kind to be partly powered by a large-scale solar farm. <a href="https://greenfrogconnect.co.uk/2021/06/01/private-wire-solar-installation-at-factory/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2021/06/01/private-wire-solar-installation-at-factory/">Private wire solar installation</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect have connected a 4.9MW private wire solar installation at a factory in Leicestershire to the grid, creating a sustainable production facility which is the first of its’ kind to be partly powered by a large-scale solar farm.</p>



<figure class="wp-block-image size-full is-resized"><img fetchpriority="high" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Private-wire-installation.jpg" alt="Solar farm private wire installation" class="wp-image-2418" width="945" height="630" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Private-wire-installation.jpg 1890w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Private-wire-installation-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Private-wire-installation-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Private-wire-installation-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Private-wire-installation-1536x1024.jpg 1536w" sizes="(max-width: 945px) 100vw, 945px" /></figure>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<p class="wp-block-paragraph"><strong>Location:</strong>&nbsp;Leicestershire<br><strong>Project value:&nbsp;</strong>£350k<br><strong>Services:</strong>&nbsp;Construction services, design</p>



<p class="wp-block-paragraph">Our innovative technical solutions resulted in a vastly reduced project lead time and subsequently significant cost savings for the client.</p>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">Demonstrating the company’s commitment to implement more resource-efficient methods in its manufacturing process, the ‘hard-wired’ solar development will provide 30% of the site’s annual electricity demand, enabling the facility to reduce its carbon footprint and reliance on the national grid.</p>



<p class="wp-block-paragraph">Green Frog Connect were responsible for the turnkey design and installation of the 11kV cable that connects the solar park to the factory, as well as an extension of the existing 11kV switchboard which allowed the solar park to be integrated into the factory’s existing network.</p>



<p class="wp-block-paragraph">The project, which in part aimed to address the company’s sustainability concerns, was made technically challenging as the solar farm is located some distance from the factory itself. The existing Distribution Network Operator (DNO) metering substation supplying the factory required a generator constraint panel for the solar farm which was located two kilometres away.</p>



<p class="wp-block-paragraph">In partnership with the rest of the project team, our challenge was to find a reliable solution to transfer the constraint signals to the solar park. With tight client deadlines and restrictive manufacturer availability, we designed and built our innovative technical solution in-house.</p>



<p class="wp-block-paragraph">Using a fibre cable, complete with programmable converters, we were able to transform the hardwired volt free contacts via the ethernet. Our technical specialists designed and personally built the required panels mirroring each other at the remote ends. Each panel is built with an integrated supply unit with battery support should external supplies fail. We addressed any potential failure in communication by building in a watchdog for continuous monitoring to curtail generation if required to avoid tripping of any existing factory supplies.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2021/06/01/private-wire-solar-installation-at-factory/">Private wire solar installation</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rising to the challenge</title>
		<link>https://greenfrogconnect.co.uk/2020/02/14/rising-to-the-challenge/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Fri, 14 Feb 2020 12:41:55 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Project announcements]]></category>
		<category><![CDATA[Design and build]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[I&C]]></category>
		<category><![CDATA[Industrial and commercial]]></category>
		<category><![CDATA[Solar energy]]></category>
		<guid isPermaLink="false">https://greenfrogconnect.co.uk/?p=1725</guid>

					<description><![CDATA[<p>We’ve just completed our latest connection to a private wire solar project, designed to supply an existing industrial client. <a href="https://greenfrogconnect.co.uk/2020/02/14/rising-to-the-challenge/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2020/02/14/rising-to-the-challenge/">Rising to the challenge</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We’ve just completed our latest connection to a private wire solar project, designed to supply an existing industrial client.</p>



<p class="wp-block-paragraph">The existing DNO metering substation supplying the factory required a generator constrain panel for the solar farm which was located some two kilometres away. Our challenge was to find a reliable solution to transfer the constraint signals to the solar park.</p>



<p class="wp-block-paragraph">Our solution was to use a fibre cable, complete with programable converters, to transform the hardwired volt free contacts via the ethernet. Due to tight client deadlines, and typical manufacturer availability, we designed and built the required panels mirroring each other at the remote ends. A built-in watchdog for continuous monitoring ensured any failure in communication would curtail generation and avoid tripping of any existing factory supplies. Each panel is built with an integrated supply unit with battery support should external supplies fail.</p>



<figure class="wp-block-image size-large is-resized"><img decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-1024x1024.jpg" alt="Private wire solar project" class="wp-image-1726" width="512" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-1024x1024.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-300x300.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-150x150.jpg 150w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-768x768.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-1536x1536.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Private-wire-solar-project-2048x2048.jpg 2048w" sizes="(max-width: 512px) 100vw, 512px" /></figure>
<p>The post <a href="https://greenfrogconnect.co.uk/2020/02/14/rising-to-the-challenge/">Rising to the challenge</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Solar Park at Fields Farm</title>
		<link>https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Thu, 20 Apr 2017 10:46:15 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Scottish power energy networks]]></category>
		<category><![CDATA[Solar energy]]></category>
		<guid isPermaLink="false">http://www.energycreative.co.uk/gfconnect/?p=562</guid>

					<description><![CDATA[<p>The land area, located adjacent to an existing solar park, required a connection of 11kV to the local Scottish Power Energy Networks distribution network. <a href="https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/">Solar Park at Fields Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">The land area, located adjacent to an existing&nbsp;<a href="https://greenfrogconnect.co.uk/sectors/renewable-energy-grid-connection/" data-type="page" data-id="1040" target="_blank" rel="noreferrer noopener">solar park</a>, required a connection of 11kV to the local Scottish Power Energy Networks distribution network. To reduce the contestable costs the substation was located as close as possible to the point of connection. We designed and built a sequential breaker to allow this to be achieved.</p>



<div class="wp-block-image"><figure class="alignleft size-full is-resized"><img decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm.jpg" alt="Solar Park at Fields Farm" class="wp-image-2423" width="810" height="540" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm.jpg 1620w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2021/06/Solar-Park-at-Fields-Farm-1536x1024.jpg 1536w" sizes="(max-width: 810px) 100vw, 810px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Shropshire<br>Capacity:&nbsp;3.5MW<br>Project length:&nbsp;Six months<br>Client:&nbsp;<a href="https://www.lightsourcebp.com/uk/" target="_blank" rel="noreferrer noopener">Lightsource Renewable Energy</a></h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Completed on time allowing the client to meet their feed-in tariff deadline.</li><li>Completed on budget despite challenging off-site cable route along A41 which went through a built-up area, and over a shallow canal bridge.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">The project comprised a 5MW (export) electricity connection to a new solar park. We acted as the Independent Connections Provider and undertook the following scope of services:</p>



<ul class="wp-block-list"><li>Construction of the electricity grid connection contestable works. Single 3.5MW teed connection to the SPEN distribution network, 1.2km of 11kV power cabling systems and optical fibre, new substation building with associated switchgear, auxiliary plant, and equipment.</li><li>Construction of the balance of plant sequential switchgear comprising the installation of 11kV switchgear, substation civil works, and 0.7km of 11kV power cabling systems.</li></ul>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/04/20/solar-park-fields-farm/">Solar Park at Fields Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rodbourne Rail Solar Farm</title>
		<link>https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Mon, 27 May 2013 10:22:20 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[British Solar Renewables]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Solar energy]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=408</guid>

					<description><![CDATA[<p>Green Frog Connect was the appointed Independent Connections Provider for this solar farm development, which was completed in May 2013 and provides sufficient power for 1,970 homes. <a href="https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/">Rodbourne Rail Solar Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect was the appointed <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">Independent Connections Provider</a> for this <a href="https://greenfrogconnect.co.uk/sectors/renewable-energy-grid-connection/">solar farm development</a>, which was completed in May 2013 and provides sufficient power for 1,970 homes.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img loading="lazy" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-1024x684.jpg" alt="Solar panel" class="wp-image-2092" width="768" height="513" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-1024x684.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-768x513.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm.jpg 1300w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Malmesbury, Wiltshire<br>Capacity:&nbsp;7.6MW<br>Project length:&nbsp;Two months<br>Client:&nbsp;<a href="https://britishrenewables.com/" target="_blank" rel="noreferrer noopener">British Solar Renewables</a></h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Design approval and energisation was achieved in only two months allowing the client to meet their ROC deadline.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">A 7.6MW solar park, this project was connected to the local 33kV network via teed connection 500m from the site. The substation building provided was of GRP construction. Our services comprised:</p>



<ul class="wp-block-list"><li>Design, project management and construction for the new contestable works</li><li>Installation of 33kV metering substation</li><li>Associated jointing, excavation and cable pulling works</li><li>Project Management of non-contestable works</li></ul>