<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Wind energy Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/wind-energy/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Tue, 03 Jan 2023 10:36:11 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>Wind energy Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Red Gap Moor Wind Farm</title>
		<link>https://greenfrogconnect.co.uk/2017/09/27/red-gap-moor-wind-farm/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Wed, 27 Sep 2017 09:25:25 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[Airvolution Energy]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Wind energy]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=379</guid>

					<description><![CDATA[<p>Green Frog Connect acted as the Independent Connection Provider for this 12.5MW wind farm generation plant, undertaking the design and construction of the electricity grid connection contestable works.  <a href="https://greenfrogconnect.co.uk/2017/09/27/red-gap-moor-wind-farm/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/red-gap-moor-wind-farm/">Red Gap Moor Wind Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect acted as the <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">Independent Connection Provider</a> for this 12.5MW <a data-type="page" data-id="1040" href="https://greenfrogconnect.co.uk/sectors/renewable-energy-grid-connection/">wind farm generation plant</a>, undertaking the design and construction of the electricity grid connection contestable works. The project included a 5MW radial connection and a 7.5MW radial connection to the Northern Powergrid distribution network.</p>


<div class="wp-block-image">
<figure class="alignleft size-large is-resized"><img fetchpriority="high" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Red-Gap-Moor-Wind-Farm-1024x683.jpg" alt="Red Gap Moor Wind Farm grid connection" class="wp-image-2093" width="768" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Red-Gap-Moor-Wind-Farm-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Red-Gap-Moor-Wind-Farm-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Red-Gap-Moor-Wind-Farm-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Red-Gap-Moor-Wind-Farm.jpg 1300w" sizes="(max-width: 768px) 100vw, 768px" /></figure>
</div>


<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location: County Durham<br>Capacity: 12.5MW<br>Project length: Seven months<br>Client: Airvolution Energy Ltd</h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list">
<li>Completed on time, allowing the client to meet their RoC tariff deadline.</li>



<li>On budget and achieved a significant saving compared to the DNO offer.</li>
</ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">The project comprised of the excavation and laying of two 11kV cables and telecommunication cables in a common trench from Northern Powergrid’s 66/11kV Substation to the 11kV Metered Ring Main Units, housed in the intake substation situated on the wind farm. Our services covered the design and installation of new 11kV apparatus for the Contestable Works, comprising:</p>



<ul class="wp-block-list">
<li>The design and installation of the 11kV substation layout.</li>



<li>The 11kV switchgear and ancillary apparatus.</li>



<li>Earthing design of the 11kV substation.</li>



<li>The design of the 11kV cable systems and protection systems.</li>
</ul>



<p class="wp-block-paragraph">Located in County Durham, the greenfield site is surrounded by private agricultural land and woodland areas, and it was necessary for a short section of the cable route to pass under a river. Green Frog Connect installed this cabling in ducts using Directional Drilling techniques.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/red-gap-moor-wind-farm/">Red Gap Moor Wind Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tai Hen Wind Turbine</title>
		<link>https://greenfrogconnect.co.uk/2013/09/27/tai-hen-wind-turbine/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Fri, 27 Sep 2013 10:23:29 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[Livos Energy]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Wind energy]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=412</guid>

					<description><![CDATA[<p>Green Frog Connect were appointed to provide the contestable design works for this 11kV wind turbine development. <a href="https://greenfrogconnect.co.uk/2013/09/27/tai-hen-wind-turbine/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/09/27/tai-hen-wind-turbine/">Tai Hen Wind Turbine</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Green Frog Connect were appointed to provide the <a href="https://greenfrogconnect.co.uk/what-we-do/design-and-build/" target="_blank" rel="noreferrer noopener">contestable design works</a> for this 11kV wind turbine development, which was completed in September 2013.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Tai-Hen-Wind-Turbine-1024x683.jpg" alt="Wind turbine" class="wp-image-2095" width="768" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Tai-Hen-Wind-Turbine-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Tai-Hen-Wind-Turbine-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Tai-Hen-Wind-Turbine-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Tai-Hen-Wind-Turbine.jpg 1300w" sizes="(max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Anglesey<br>Capacity:&nbsp;500kW<br>Project length:&nbsp;Four months<br>Client:&nbsp;Livos Energy</h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Project connected on time to allow the client to meet their feed in tariff deadline.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">Our services comprised:</p>



<ul class="wp-block-list"><li>Design, project management and construction for the new contestable works.</li><li>Installation of 11kV metering substation.</li><li>Associated jointing, excavation and cable pulling works.</li><li>Project Management of non-contestable works.</li></ul>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/09/27/tai-hen-wind-turbine/">Tai Hen Wind Turbine</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
