<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Diesel power station Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/diesel-power/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Tue, 20 Apr 2021 06:35:05 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>Diesel power station Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Dowlais STOR Plant</title>
		<link>https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Fri, 27 Dec 2013 11:14:03 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Diesel power station]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Short Term Operating Reserve]]></category>
		<category><![CDATA[STOR]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=405</guid>

					<description><![CDATA[<p>Green Frog Connect were the appointed Independent Connections Provider for this 20MW Short Term Operating Reserve (STOR) diesel power station. The project included design, project management and construction for the new contestable works, and project management of non-contestable works. <a href="https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/">Dowlais STOR Plant</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect were the appointed <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">Independent Connections Provider</a> for this 20MW Short Term Operating Reserve (STOR) diesel power station. The project included design, project management and construction for the new contestable works, and project management of non-contestable works.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img fetchpriority="high" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-1024x682.jpg" alt="Dowlais STOR plant" class="wp-image-2086" width="768" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-1024x682.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-1536x1023.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2.jpg 1897w" sizes="(max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Dowlais<br>Capacity:&nbsp;20MW<br>Project length:&nbsp;Six months<br>Client:&nbsp;Green Frog Power</h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Re-design of client private network to remove the need for a central power transformer which reduced costs and increased the resiliency of the site.</li><li>In 2017, a second phase to the project was completed which added an extra 20MW of gas generation. Spare ducts installed for the electricity connection during phase one were utilised during this phase helping reduce costs and disruptive roadworks to the local area.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">Completed in February 2013, this 20MW diesel power station gives provision for additional active power from generation and/or demand reduction. Our services comprised:</p>



<ul class="wp-block-list"><li>Design, Project Management and Construction for the new contestable works</li><li>Installation of 33kV metering substation</li><li>Associated jointing, excavation and cable pulling works</li><li>Project Management of non-contestable works</li></ul>



<p class="wp-block-paragraph">Green Frog Trading&nbsp;now dispatch the plant to ensure Capacity Market events are met, and also operates on the open market providing power at times when renewable generation is low, and/or when demand is high.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/">Dowlais STOR Plant</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
