<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>British Solar Renewables Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/british-solar-renewables/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Fri, 15 Jan 2021 08:26:54 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>British Solar Renewables Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Rodbourne Rail Solar Farm</title>
		<link>https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Mon, 27 May 2013 10:22:20 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Renewables]]></category>
		<category><![CDATA[British Solar Renewables]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Renewable energy]]></category>
		<category><![CDATA[Solar energy]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=408</guid>

					<description><![CDATA[<p>Green Frog Connect was the appointed Independent Connections Provider for this solar farm development, which was completed in May 2013 and provides sufficient power for 1,970 homes. <a href="https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/">Rodbourne Rail Solar Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect was the appointed <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">Independent Connections Provider</a> for this <a href="https://greenfrogconnect.co.uk/sectors/renewable-energy-grid-connection/">solar farm development</a>, which was completed in May 2013 and provides sufficient power for 1,970 homes.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img fetchpriority="high" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-1024x684.jpg" alt="Solar panel" class="wp-image-2092" width="768" height="513" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-1024x684.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm-768x513.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2017/09/Rodbourne-rail-solar-farm.jpg 1300w" sizes="(max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Malmesbury, Wiltshire<br>Capacity:&nbsp;7.6MW<br>Project length:&nbsp;Two months<br>Client:&nbsp;<a href="https://britishrenewables.com/" target="_blank" rel="noreferrer noopener">British Solar Renewables</a></h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Design approval and energisation was achieved in only two months allowing the client to meet their ROC deadline.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">A 7.6MW solar park, this project was connected to the local 33kV network via teed connection 500m from the site. The substation building provided was of GRP construction. Our services comprised:</p>



<ul class="wp-block-list"><li>Design, project management and construction for the new contestable works</li><li>Installation of 33kV metering substation</li><li>Associated jointing, excavation and cable pulling works</li><li>Project Management of non-contestable works</li></ul>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/05/27/rodbourne-rail-solar-farm/">Rodbourne Rail Solar Farm</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
