<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Gas-fired power generation Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/gas-fired-power-generation/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Thu, 01 Jun 2023 13:32:40 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>Gas-fired power generation Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Urban Reserve Phase 3 Projects</title>
		<link>https://greenfrogconnect.co.uk/2023/06/01/urban-reserve-phase-3-projects/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Thu, 01 Jun 2023 13:32:35 +0000</pubDate>
				<category><![CDATA[Gas peaking]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Engineering, procurement and construction]]></category>
		<category><![CDATA[EPC]]></category>
		<category><![CDATA[Flexible power generation]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<guid isPermaLink="false">https://greenfrogconnect.co.uk/?p=2782</guid>

					<description><![CDATA[<p>Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. <a href="https://greenfrogconnect.co.uk/2023/06/01/urban-reserve-phase-3-projects/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2023/06/01/urban-reserve-phase-3-projects/">Urban Reserve Phase 3 Projects</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">AMP Clean Energy funds, develops and operates low carbon, heat, and power assets. They focus on net zero customer solutions which helps businesses decarbonise heat and build grid solutions that help to decarbonise electricity. Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period.</p>



<p class="wp-block-paragraph"><strong>Location:</strong> UK wide<br><strong>Client: </strong><a href="https://www.ampcleanenergy.com/" target="_blank" rel="noreferrer noopener">AMP Clean Energy</a><br><strong>Services: </strong><a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">ICP</a>, <a href="https://greenfrogconnect.co.uk/what-we-do/engineering-procurement-and-construction/">Engineering, Procurement and Construction services</a></p>



<div style="height:30px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">The purpose of the project was to help support the growth of renewables by providing energy on-demand when the wind doesn’t blow and the sun doesn’t shine. This helps to balance the electricity grid ensuring that enough power is generated whilst supporting the transition to a low carbon economy. Green Frog Connect were appointed to act as the ICP for grid connections and as EPC for the construction of the six gas peaking power plants as part of AMP Clean Energy’s Urban Reserve project.</p>



<p class="wp-block-paragraph">We faced a challenge in that all of the sites were located on brownfield industrial estates. Using our expertise we saved space and ensured that all sites were built to the highest safety standard whilst accommodating multiple activities. The first project began in late 2020 with each following mobilisation taking place on a weekly basis. The first site became fully energised in March 2021.</p>



<div style="height:10px" aria-hidden="true" class="wp-block-spacer"></div>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow">
<p class="wp-block-paragraph">All six sites were up and running simultaneously and throughout the project Green Frog Connect demonstrated the depth and flexibility of our construction teams to ensure that AMP Clean Energy was confident in our delivery promises.</p>
</blockquote>



<div style="height:10px" aria-hidden="true" class="wp-block-spacer"></div>



<p class="wp-block-paragraph">Our initial appointment was to undertake the contestable design and place orders for long lead time equipment. The client’s gas engines and HV switch room had already been ordered which helped to reduce construction activities to 20 weeks per project. We had full responsibility for the contestable works, site civil construction, the electrical balance of plant installation and co-ordination of the full site commissioning through to client handover.</p>



<p class="wp-block-paragraph">Green Frog Connect managed to maintain momentum across the project and ensured all sites were connected on time and within the budget set by the client. We worked closely with the client’s Original Equipment Manufacturer (OEM), co-ordinating all activity with the Distribution Network Operator to ensure that the client’s route to market was achieved at the earliest opportunity.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2023/06/01/urban-reserve-phase-3-projects/">Urban Reserve Phase 3 Projects</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Successful commissioning of Rossington 4MW project</title>
		<link>https://greenfrogconnect.co.uk/2018/12/10/successful-commissioning-of-rossington-4mw-project/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Mon, 10 Dec 2018 13:21:40 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Project announcements]]></category>
		<category><![CDATA[Engineering, procurement and construction]]></category>
		<category><![CDATA[EPC]]></category>
		<category><![CDATA[Flexible power generation]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Suncredit Energy]]></category>
		<guid isPermaLink="false">https://greenfrogconnect.co.uk/?p=854</guid>

					<description><![CDATA[<p>A 4MW Green Frog Connect project for Suncredit Energy near Doncaster is now fully operational and optimised, ready to deliver secure decentralised power when it is needed most.<br />
						 <a href="https://greenfrogconnect.co.uk/2018/12/10/successful-commissioning-of-rossington-4mw-project/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2018/12/10/successful-commissioning-of-rossington-4mw-project/">Successful commissioning of Rossington 4MW project</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>A 4MW Green Frog Connect project for Suncredit Energy near Doncaster is now fully operational and optimised, ready to deliver secure decentralised power when it is needed most. We were delighted to support Suncredit as their EPC contractor for the design, install and commissioning of their first gas-fired power station.</p>
<p>Suncredit’s Development Director, John Leith, says, “<em>We received the first notification to dispatch at 09:11 on Monday 26th November and ramped up in less than 120 seconds. We would like to take this opportunity to thank all those who have been involved in the delivery of this project and look forward to working together in the future.</em>”</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2018/12/10/successful-commissioning-of-rossington-4mw-project/">Successful commissioning of Rossington 4MW project</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Timelapse of Swansea West site construction</title>
		<link>https://greenfrogconnect.co.uk/2018/07/12/timelapse-of-swansea-west-site-construction/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Thu, 12 Jul 2018 13:29:47 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Project announcements]]></category>
		<category><![CDATA[Design and build]]></category>
		<category><![CDATA[Flexible power generation]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Principal contractor]]></category>
		<guid isPermaLink="false">https://greenfrogconnect.co.uk/?p=758</guid>

					<description><![CDATA[<p>Our site at Swansea West is now fully developed and providing back up generation to the energy distribution network. <a href="https://greenfrogconnect.co.uk/2018/07/12/timelapse-of-swansea-west-site-construction/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2018/07/12/timelapse-of-swansea-west-site-construction/">Timelapse of Swansea West site construction</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Our site at Swansea West is now fully developed and providing back up generation to the energy distribution network. We filmed throughout the construction of the 40MW site, which was developed over two 20MW phases to facilitate 27 GE Jenbacher Generator Sets. In just over three minutes you can now see the installation of phase A, which took seven months to build out – from the initial works to the installation of the transformers, and more!</p>



<p class="wp-block-paragraph"><strong><a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/">You can find more details on the project here.</a></strong></p>



<p class="wp-block-paragraph"><a href="https://www.youtube.com/watch?v=hOejYY-WpzI" target="_blank" rel="noreferrer noopener"><strong>Click here to watch the site develop on Youtube.</strong></a></p>



<div class="wp-block-image"><figure class="alignleft is-resized"><a href="https://www.youtube.com/watch?v=hOejYY-WpzI" target="_blank" rel="noreferrer noopener"><img fetchpriority="high" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse-1024x575.jpg" alt="" class="wp-image-1315" width="512" height="288" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse-1024x575.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse-300x168.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse-768x431.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse.jpg 1273w" sizes="(max-width: 512px) 100vw, 512px" /></a></figure></div>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2018/07/12/timelapse-of-swansea-west-site-construction/">Timelapse of Swansea West site construction</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Swansea West gas-fired power generation</title>
		<link>https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Wed, 27 Sep 2017 10:06:32 +0000</pubDate>
				<category><![CDATA[Gas peaking]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Design and build]]></category>
		<category><![CDATA[Flexible power generation]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Principal contractor]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=400</guid>

					<description><![CDATA[<p>We are acting as the principal contractor as well as the Independent Connection Provider for a new gas-fired power generation site at Swansea West.<br />
						 <a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/">Swansea West gas-fired power generation</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">We are acting as the principal contractor as well as the <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/" target="_blank" rel="noreferrer noopener">Independent Connection Provider</a> for a new <a data-type="page" data-id="1037" href="https://greenfrogconnect.co.uk/sectors/gas-peaking-grid-connection/" target="_blank" rel="noreferrer noopener">gas-fired power generation</a> site at Swansea West.</p>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-1024x683.jpg" alt="" class="wp-image-1693" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1.jpg 1890w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<p class="wp-block-paragraph"><strong>Location:</strong>&nbsp;Swansea West<br><strong>Capacity:</strong> 40MW<br><strong>Project length:</strong> Seven months<br><strong>Client:</strong> Green Frog Power</p>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>We designed and negotiated a simplified connection arrangement which saved the client in excess of £500k compared to their original arrangement.</li><li>We diverted a private overhead line that was originally routed through the site and managed all outages to ensure that the businesses being fed did not lose supply.</li><li>A shared electricity and gas trench for the off-site connections was coordinated to minimise costs and reduce the amount of disruption to the local community.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<figure class="wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex"><ul class="blocks-gallery-grid"><li class="blocks-gallery-item"><figure><img decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1692" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-2/#main" class="wp-image-1692" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2.jpg 1890w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1691" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-3/#main" class="wp-image-1691" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1690" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-4/#main" class="wp-image-1690" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1689" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-5/#main" class="wp-image-1689" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1688" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-6/#main" class="wp-image-1688" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1687" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-7/#main" class="wp-image-1687" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li></ul></figure>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Time-lapse of site build</h2>



<p class="wp-block-paragraph"><a href="https://www.youtube.com/watch?v=hOejYY-WpzI" target="_blank" rel="noreferrer noopener"><strong>Click here to watch the site develop on Youtube.</strong></a></p>



<figure class="wp-block-image"><a href="https://www.youtube.com/watch?v=hOejYY-WpzI" target="_blank" rel="noopener noreferrer"><img decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse.jpg" alt="Time-lapse of Swansea West site build"/></a></figure>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/">Swansea West gas-fired power generation</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Redfield Road Gas-fired Generation Plant</title>
		<link>https://greenfrogconnect.co.uk/2017/09/27/redfield-road-gas-fired-generation-plant/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Wed, 27 Sep 2017 09:36:31 +0000</pubDate>
				<category><![CDATA[Gas peaking]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Engineering, procurement and construction]]></category>
		<category><![CDATA[EPC]]></category>
		<category><![CDATA[Flexible power generation]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Viridis 178]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=382</guid>

					<description><![CDATA[<p>Green Frog Connect acted as the Principal Contractor as well as the Independent Connection Provider for this 40MW gas-fired power generation plant, which provides reserve power to National Grid through the Capacity Market. <a href="https://greenfrogconnect.co.uk/2017/09/27/redfield-road-gas-fired-generation-plant/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/redfield-road-gas-fired-generation-plant/">Redfield Road Gas-fired Generation Plant</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect acted as the Principal Contractor as well as the <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/" target="_blank" rel="noreferrer noopener">Independent Connection Provider</a> for this 40MW <a data-type="page" data-id="1037" href="https://greenfrogconnect.co.uk/sectors/gas-peaking-grid-connection/" target="_blank" rel="noreferrer noopener">gas-fired power generation plant</a>, which provides reserve power to National Grid through the Capacity Market.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img loading="lazy" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Redfield-1024x683.jpg" alt="ICP for Redfield Road gas-fired generation plant" class="wp-image-2083" width="768" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Redfield-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Redfield-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Redfield-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Redfield-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Redfield.jpg 1920w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Nottingham<br>Capacity:&nbsp;40MW<br>Project length:&nbsp;Two phases, each comprising seven months<br>Client:&nbsp;Viridis 178 Ltd</h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>We completed the highest risk element of the project – a dual directional drill under the A52 in central Nottingham for the electricity connection – on time and under budget. The A52 is critical national infrastructure operated by Highways England. Whilst installing the duct for Phase A, the opportunity was taken to install a second duct for Phase B, despite it being a speculative development at the time, saving the client more than £100,000 on Phase B.</li><li>The project completed on time, ahead of the winter period, allowing the client to earn valuable income during times of high electricity demand and to provide support to the local and national electricity networks.</li><li>Project completed under budget.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">The project was constructed in two phases, each taking seven months. Phase A (20MW) and Phase B (20MW) each have their own 33kV connection to Western Power Distribution, as well as their own connection to the local Intermediate Pressure (IP) gas network. Our services comprised:</p>



<ul class="wp-block-list"><li>The design and construction of the electricity grid connection contestable works. Two 20MW tee-off connections to the WPD distribution network.</li><li>The design and construction of the balance of plant, including switchgear, transformers, power cabling systems, SCADA/control system, the auxiliary power system and a security system.</li><li>The design and construction of the civil works including ground works, reinforced concrete structures, fencing and access roads.</li></ul>



<p class="wp-block-paragraph">The installation and commissioning of the 27 GE Jenbacher Generator Sets, and the gas connections, were undertaken by&nbsp;Green Frog Genovate&nbsp;and&nbsp;Green Frog Gas Utilities&nbsp;respectively.&nbsp;Green Frog Trading&nbsp;now dispatch the plant to ensure&nbsp;Capacity Market&nbsp;events are met, and also operates on the open market providing power at times when renewable generation is low, and/or when demand is high.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/redfield-road-gas-fired-generation-plant/">Redfield Road Gas-fired Generation Plant</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A lower carbon way to help keep the lights on</title>
		<link>https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Mon, 12 Jun 2017 10:35:01 +0000</pubDate>
				<category><![CDATA[Company news]]></category>
		<category><![CDATA[News]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Green Frog Trading]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=335</guid>

					<description><![CDATA[<p>Green Frog Connect today breaks ground on an additional site at Swansea West which showcases their commitment to working towards less carbon intensive energy solutions. <a href="https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/">A lower carbon way to help keep the lights on</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h4>Green Frog Connect today breaks ground on an additional site at Swansea West which showcases their commitment to working towards less carbon intensive energy solutions.</h4>
<p>Providing reserve power to the National Grid through the Capacity Market, the site will help to ensure that reliable energy capacity is available at times of extreme network stress.</p>
<p>The new gas-fired power generation site will provide 40MW of back-up generation to the energy distribution network, reducing the danger of blackouts for homes and businesses when the National Grid is under strain, for instance when renewable generation suddenly drops off and large centralised generators can’t respond fast enough to meet the demand. Adjacent to an existing 20MW diesel generation site which has been in use for the past 5 years, the new site will be ready to operate by the end of 2017. Green Frog Connect are acting as the principal contractor as well as the Independent Connection Provider.</p>
<p>Tom Drake, Director of Green Frog Connect, said: “This is an exciting moment for us as we demonstrate our progression towards reducing carbon emissions and look to the future in terms of working towards flexible, zero carbon power provision. Lowering carbon emissions is a priority for us, and co-locating the two sites ensures we can provide power at times when renewable generation is low, or when demand is high.”</p>
<p>The 27 generators required by the site will be installed, commissioned and maintained by Green Frog Genovate and the gas connection will be undertaken by Green Frog Gas Utilities. Once operational, the site will be controlled by Green Frog Trading to meet the requirements of the Capacity Market and to operate on the open market.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/">A lower carbon way to help keep the lights on</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
