<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Green Frog Power Archives &#187; Green Frog Connect</title>
	<atom:link href="https://greenfrogconnect.co.uk/tag/green-frog-power/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>We design and build high-voltage connections to the national electricity grid</description>
	<lastBuildDate>Tue, 20 Apr 2021 06:35:05 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greenfrogconnect.co.uk/wp-content/uploads/2019/04/cropped-Green-Frog-Connect-favicon-32x32.png</url>
	<title>Green Frog Power Archives &#187; Green Frog Connect</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Swansea West gas-fired power generation</title>
		<link>https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Wed, 27 Sep 2017 10:06:32 +0000</pubDate>
				<category><![CDATA[Gas peaking]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Design and build]]></category>
		<category><![CDATA[Flexible power generation]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Principal contractor]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=400</guid>

					<description><![CDATA[<p>We are acting as the principal contractor as well as the Independent Connection Provider for a new gas-fired power generation site at Swansea West.<br />
						 <a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/">Swansea West gas-fired power generation</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">We are acting as the principal contractor as well as the <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/" target="_blank" rel="noreferrer noopener">Independent Connection Provider</a> for a new <a data-type="page" data-id="1037" href="https://greenfrogconnect.co.uk/sectors/gas-peaking-grid-connection/" target="_blank" rel="noreferrer noopener">gas-fired power generation</a> site at Swansea West.</p>



<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-1024x683.jpg" alt="" class="wp-image-1693" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-1.jpg 1890w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<p class="wp-block-paragraph"><strong>Location:</strong>&nbsp;Swansea West<br><strong>Capacity:</strong> 40MW<br><strong>Project length:</strong> Seven months<br><strong>Client:</strong> Green Frog Power</p>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>We designed and negotiated a simplified connection arrangement which saved the client in excess of £500k compared to their original arrangement.</li><li>We diverted a private overhead line that was originally routed through the site and managed all outages to ensure that the businesses being fed did not lose supply.</li><li>A shared electricity and gas trench for the off-site connections was coordinated to minimise costs and reduce the amount of disruption to the local community.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<figure class="wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex"><ul class="blocks-gallery-grid"><li class="blocks-gallery-item"><figure><img decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1692" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-2/#main" class="wp-image-1692" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-2.jpg 1890w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1691" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-3/#main" class="wp-image-1691" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-3.jpg 1890w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1690" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-4/#main" class="wp-image-1690" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-4.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1689" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-5/#main" class="wp-image-1689" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-5.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1688" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-6/#main" class="wp-image-1688" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-6.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="1024" height="683" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-1024x683.jpg" alt="Gas-fired power generation construction" data-id="1687" data-full-url="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7.jpg" data-link="https://greenfrogconnect.co.uk/swansea-west-gas-fired-power-generation/swansea-west-7/#main" class="wp-image-1687" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7-1536x1024.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/09/Swansea-West-7.jpg 1890w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></li></ul></figure>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Time-lapse of site build</h2>



<p class="wp-block-paragraph"><a href="https://www.youtube.com/watch?v=hOejYY-WpzI" target="_blank" rel="noreferrer noopener"><strong>Click here to watch the site develop on Youtube.</strong></a></p>



<figure class="wp-block-image"><a href="https://www.youtube.com/watch?v=hOejYY-WpzI" target="_blank" rel="noopener noreferrer"><img decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2019/07/GreenFrogConnect_Swansea_Timelapse.jpg" alt="Time-lapse of Swansea West site build"/></a></figure>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/09/27/swansea-west-gas-fired-power-generation/">Swansea West gas-fired power generation</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A lower carbon way to help keep the lights on</title>
		<link>https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Mon, 12 Jun 2017 10:35:01 +0000</pubDate>
				<category><![CDATA[Company news]]></category>
		<category><![CDATA[News]]></category>
		<category><![CDATA[Gas-fired power generation]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Green Frog Trading]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=335</guid>

					<description><![CDATA[<p>Green Frog Connect today breaks ground on an additional site at Swansea West which showcases their commitment to working towards less carbon intensive energy solutions. <a href="https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/">A lower carbon way to help keep the lights on</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h4>Green Frog Connect today breaks ground on an additional site at Swansea West which showcases their commitment to working towards less carbon intensive energy solutions.</h4>
<p>Providing reserve power to the National Grid through the Capacity Market, the site will help to ensure that reliable energy capacity is available at times of extreme network stress.</p>
<p>The new gas-fired power generation site will provide 40MW of back-up generation to the energy distribution network, reducing the danger of blackouts for homes and businesses when the National Grid is under strain, for instance when renewable generation suddenly drops off and large centralised generators can’t respond fast enough to meet the demand. Adjacent to an existing 20MW diesel generation site which has been in use for the past 5 years, the new site will be ready to operate by the end of 2017. Green Frog Connect are acting as the principal contractor as well as the Independent Connection Provider.</p>
<p>Tom Drake, Director of Green Frog Connect, said: “This is an exciting moment for us as we demonstrate our progression towards reducing carbon emissions and look to the future in terms of working towards flexible, zero carbon power provision. Lowering carbon emissions is a priority for us, and co-locating the two sites ensures we can provide power at times when renewable generation is low, or when demand is high.”</p>
<p>The 27 generators required by the site will be installed, commissioned and maintained by Green Frog Genovate and the gas connection will be undertaken by Green Frog Gas Utilities. Once operational, the site will be controlled by Green Frog Trading to meet the requirements of the Capacity Market and to operate on the open market.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2017/06/12/a-lower-carbon-way-to-help-keep-the-lights-on/">A lower carbon way to help keep the lights on</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Dowlais STOR Plant</title>
		<link>https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Fri, 27 Dec 2013 11:14:03 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Diesel power station]]></category>
		<category><![CDATA[Green Frog Connect]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Short Term Operating Reserve]]></category>
		<category><![CDATA[STOR]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=405</guid>

					<description><![CDATA[<p>Green Frog Connect were the appointed Independent Connections Provider for this 20MW Short Term Operating Reserve (STOR) diesel power station. The project included design, project management and construction for the new contestable works, and project management of non-contestable works. <a href="https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/">Dowlais STOR Plant</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect were the appointed <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">Independent Connections Provider</a> for this 20MW Short Term Operating Reserve (STOR) diesel power station. The project included design, project management and construction for the new contestable works, and project management of non-contestable works.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img loading="lazy" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-1024x682.jpg" alt="Dowlais STOR plant" class="wp-image-2086" width="768" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-1024x682.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2-1536x1023.jpg 1536w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_Dowlais-2.jpg 1897w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Dowlais<br>Capacity:&nbsp;20MW<br>Project length:&nbsp;Six months<br>Client:&nbsp;Green Frog Power</h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>Re-design of client private network to remove the need for a central power transformer which reduced costs and increased the resiliency of the site.</li><li>In 2017, a second phase to the project was completed which added an extra 20MW of gas generation. Spare ducts installed for the electricity connection during phase one were utilised during this phase helping reduce costs and disruptive roadworks to the local area.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">Completed in February 2013, this 20MW diesel power station gives provision for additional active power from generation and/or demand reduction. Our services comprised:</p>



<ul class="wp-block-list"><li>Design, Project Management and Construction for the new contestable works</li><li>Installation of 33kV metering substation</li><li>Associated jointing, excavation and cable pulling works</li><li>Project Management of non-contestable works</li></ul>



<p class="wp-block-paragraph">Green Frog Trading&nbsp;now dispatch the plant to ensure Capacity Market events are met, and also operates on the open market providing power at times when renewable generation is low, and/or when demand is high.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/12/27/dowlais-stor-plant/">Dowlais STOR Plant</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Drove</title>
		<link>https://greenfrogconnect.co.uk/2013/09/27/the-drove/</link>
		
		<dc:creator><![CDATA[Haydn Eyles]]></dc:creator>
		<pubDate>Fri, 27 Sep 2013 10:26:10 +0000</pubDate>
				<category><![CDATA[Gas peaking]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Engineering, procurement and construction]]></category>
		<category><![CDATA[EPC]]></category>
		<category><![CDATA[Green Frog Power]]></category>
		<category><![CDATA[Grid connection]]></category>
		<category><![CDATA[ICP]]></category>
		<category><![CDATA[Independent Connection Provider]]></category>
		<category><![CDATA[Principal contractor]]></category>
		<guid isPermaLink="false">http://localhost:8888/gfconnect/?p=415</guid>

					<description><![CDATA[<p>Green Frog Connect were the appointed designer, Independent Connections Provider and Principal Contractor for this project, which was the first gas fuelled power station to be connected under the government’s new capacity market. <a href="https://greenfrogconnect.co.uk/2013/09/27/the-drove/" class="readMoreButton">Read more</a></p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/09/27/the-drove/">The Drove</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="standfirst wp-block-paragraph">Green Frog Connect were the appointed designer, <a href="https://greenfrogconnect.co.uk/what-we-do/independent-connection-provider/">Independent Connections Provider</a> and Principal Contractor for this project, which was the first gas fuelled power station to be connected under the government’s new capacity market.</p>



<div class="wp-block-image"><figure class="alignleft size-large is-resized"><img loading="lazy" decoding="async" src="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_The-Drove-1024x683.jpg" alt="" class="wp-image-2084" width="768" height="512" srcset="https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_The-Drove-1024x683.jpg 1024w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_The-Drove-300x200.jpg 300w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_The-Drove-768x512.jpg 768w, https://greenfrogconnect.co.uk/wp-content/uploads/2020/10/GFC_The-Drove.jpg 1080w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure></div>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h5 class="wp-block-heading">Location:&nbsp;Bridgwater, Somerset<br>Capacity:&nbsp;6MW<br>Project length:&nbsp;Five months<br>Client:&nbsp;Green Frog Power</h5>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Key client benefits</h2>



<ul class="wp-block-list"><li>First of its kind project for the client delivered on time and budget.</li></ul>



<div style="height:20px" aria-hidden="true" class="wp-block-spacer"></div>



<h2 class="wp-block-heading">Project details</h2>



<p class="wp-block-paragraph">The grid connection was via two connection points on the WPD 11kV network, with the cable terminating in a new substation at The Drove Power Station. A constraining device, with radio communications apparatus was installed and provide a volt free contact to a trip G59/2 relay. Our services included:</p>



<ul class="wp-block-list"><li>EPC contractor for the design and construction of the power plant.</li><li>Design, Project Management and Construction for the new contestable works.</li><li>Installation of 11kV metering substation.</li><li>Associated jointing, excavation and cable pulling works.</li><li>Project Management of non-contestable works.</li></ul>



<p class="wp-block-paragraph">This project included the first active management constraint scheme connected to the WPD network at 11kV, to maintain network security and to prevent thermal limits, voltage limits or power quality limits from being exceeded.&nbsp;Green Frog Trading&nbsp;now dispatch the plant to ensure Capacity Market events are met, and also operates on the open market providing power at times when renewable generation is low, and/or when demand is high.</p>
<p>The post <a href="https://greenfrogconnect.co.uk/2013/09/27/the-drove/">The Drove</a> appeared first on <a href="https://greenfrogconnect.co.uk">Green Frog Connect</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
