Red Scar Business Park

Red Scar Business Park

Green Frog Connect carried out an essential 2km 33kV high voltage cable infrastructure installation at this site just off junction 31A of the M6 to connect a 40MW embedded gas peaking power plant to an existing 33kV electricity substation. Read more

ICP works for Green Lane Sawmills

Green Frog Connect completed the Independent Connection Provider (ICP) works for M. H. Southern & Company’s new production facility and sawmill, creating significant cost and time savings through negotiating an Independent Distribution Network Operator (IDNO) solution that also allowed for flexibility in the design. Read more

132kV connection for Air Liquide

Green Frog Connect successfully installed a new 20MW 132kV connection, enabling the Air Liquide’s business-critical factory upgrade to go ahead. Read more

Redfield Road Gas-fired Generation Plant

Green Frog Connect acted as the Principal Contractor as well as the Independent Connection Provider for this 40MW gas-fired power generation plant, which provides reserve power to National Grid through the Capacity Market. Read more

Red Gap Moor Wind Farm grid connection

Red Gap Moor Wind Farm

Green Frog Connect acted as the Independent Connection Provider for this 12.5MW wind farm generation plant, undertaking the design and construction of the electricity grid connection contestable works. Read more

Solar farm at Field Farm grid connection

Solar Park at Fields Farm

The land area, located adjacent to an existing solar park, required a connection of 11kV to the local Scottish Power Energy Networks distribution network. Read more

Submeadow grid connection

Sudmeadow Road Gas-fired Generation Plant

This brownfield site in Gloucestershire was constructed in one phase and has its’ own 33kV connection to Western Power Distribution. With a total site export capacity of 40MW, the gas-fired generation site has its own connection to the local High Pressure (HP) gas network. Read more

Dowlais STOR plant

Dowlais STOR Plant

Green Frog Connect were the appointed Independent Connections Provider for this 20MW Short Term Operating Reserve (STOR) diesel power station. The project included design, project management and construction for the new contestable works, and project management of non-contestable works. Read more

The Drove

Green Frog Connect were the appointed designer, Independent Connections Provider and Principal Contractor for this project, which was the first gas fuelled power station to be connected under the government’s new capacity market. Read more