Urban Reserve Phase 3 Projects
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect carried out an essential 2km 33kV high voltage cable infrastructure installation at this site just off junction 31A of the M6 to connect a 40MW embedded gas peaking power plant to an existing 33kV electricity substation. Read more
A 4MW Green Frog Connect project for Suncredit Energy near Doncaster is now fully operational and optimised, ready to deliver secure decentralised power when it is needed most.
Read more
This week marks a major milestone for Green Frog Connect – we’ve reached 1500MW of projects which have been connected or are in construction. Read more
Green Frog Connect have completed construction work on a 20MW embedded gas plant, at Cattedown Business Park in Plymouth, with zero injuries. Read more
Green Frog Connect acted as the Principal Contractor as well as the Independent Connection Provider for this 40MW gas-fired power generation plant, which provides reserve power to National Grid through the Capacity Market. Read more