Urban Reserve Phase 3 Projects
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
A 4MW Green Frog Connect project for Suncredit Energy near Doncaster is now fully operational and optimised, ready to deliver secure decentralised power when it is needed most.
Read more
Our site at Swansea West is now fully developed and providing back up generation to the energy distribution network. Read more
This week marks a major milestone for Green Frog Connect – we’ve reached 1500MW of projects which have been connected or are in construction. Read more
We are acting as the principal contractor as well as the Independent Connection Provider for a new gas-fired power generation site at Swansea West.
Read more
Green Frog Connect acted as the Principal Contractor as well as the Independent Connection Provider for this 40MW gas-fired power generation plant, which provides reserve power to National Grid through the Capacity Market. Read more
Last week we celebrated our fantastic achievement of coming 18th place in The Sunday Times Virgin Fast Track 100 league table, which ranks the fastest growing privately held companies in the UK. Read more