Urban Reserve Phase 3 Projects
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect carried out an essential 2km 33kV high voltage cable infrastructure installation at this site just off junction 31A of the M6 to connect a 40MW embedded gas peaking power plant to an existing 33kV electricity substation. Read more
We are acting as the principal contractor as well as the Independent Connection Provider for a new gas-fired power generation site at Swansea West.
Read more
Green Frog Connect acted as the Principal Contractor as well as the Independent Connection Provider for this 40MW gas-fired power generation plant, which provides reserve power to National Grid through the Capacity Market. Read more
This brownfield site in Gloucestershire was constructed in one phase and has its’ own 33kV connection to Western Power Distribution. With a total site export capacity of 40MW, the gas-fired generation site has its own connection to the local High Pressure (HP) gas network. Read more