Private wire solar installation

Green Frog Connect have connected a 4.9MW private wire solar installation at a factory in Leicestershire to the grid, creating a sustainable production facility which is the first of its’ kind to be partly powered by a large-scale solar farm. Read more

Red Gap Moor Wind Farm grid connection

Red Gap Moor Wind Farm

Green Frog Connect acted as the Independent Connection Provider for this 12.5MW wind farm generation plant, undertaking the design and construction of the electricity grid connection contestable works. Read more

Solar Park at Fields Farm

Solar Park at Fields Farm

The land area, located adjacent to an existing solar park, required a connection of 11kV to the local Scottish Power Energy Networks distribution network. Read more

Tai Hen Wind Turbine

Green Frog Connect were appointed to provide the contestable design works for this 11kV wind turbine development. Read more

Rodbourne Rail Solar Farm

Green Frog Connect was the appointed Independent Connections Provider for this solar farm development, which was completed in May 2013 and provides sufficient power for 1,970 homes. Read more