Urban Reserve Phase 3 Projects
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect were hired to provide ICP and ECP services for AMP Clean Energy’s six new build gas peaking sites, with each site typically built out over a seven month period. Read more
Green Frog Connect carried out an essential 2km 33kV high voltage cable infrastructure installation at this site just off junction 31A of the M6 to connect a 40MW embedded gas peaking power plant to an existing 33kV electricity substation. Read more
Every time we design a project, we take a long-term view, considering the way the site will be operated and equipment maintained. Now our clients can rely on our technical support for longer, helping them to maximise efficiency and reduce system compromises. Read more
Green Frog Connect completed the Independent Connection Provider (ICP) works for M. H. Southern & Company’s new production facility and sawmill, creating significant cost and time savings through negotiating an Independent Distribution Network Operator (IDNO) solution that also allowed for flexibility in the design. Read more
Green Frog Connect successfully installed a new 20MW 132kV connection, enabling the Air Liquide’s business-critical factory upgrade to go ahead. Read more
We have just completed the design, construction and commissioning of a new 132kV load supply in Birmingham. Read more
upported by Green Frog Connect, Vattenfall Networks, the UK’s newest independent electricity network provider, has won its first distribution network contract with Helvellyn Group. Read more
Our site at Swansea West is now fully developed and providing back up generation to the energy distribution network. Read more
We are acting as the principal contractor as well as the Independent Connection Provider for a new gas-fired power generation site at Swansea West.
Read more
Green Frog Connect acted as the Principal Contractor as well as the Independent Connection Provider for this 40MW gas-fired power generation plant, which provides reserve power to National Grid through the Capacity Market. Read more